What Must Be Included on a Hazardous Waste Manifest
A Uniform Hazardous Waste Manifest must identify five things:
- Who generated the waste: the generator’s name, mailing and site address, and EPA ID number
- Who is moving it: each transporter’s name and EPA ID number
- Where it is going: the designated facility’s name, site address and EPA ID number
- What it is: the DOT shipping description, the RCRA waste codes, and the number and type of containers and the total quantity
- Who is responsible for it at each step: the signatures of the generator, every transporter and the receiving facility, each dated
The form is EPA Form 8700-22, and it is the same across the country. Every hazardous waste shipment that leaves a small or large quantity generator’s site has to travel with one, and the generator is the party who prepares it.
That last part matters. Your waste vendor will usually fill out the manifest for you, but the certification in Item 15 is yours. When you sign it, you are certifying that the waste is fully and accurately described, correctly packaged and labeled, and that you have a waste minimization program in place. If the description is wrong, the signature on the wrong description is yours.
That is the strongest argument for using one provider for the whole job. With hazardous waste pickup and disposal handled by the same team that profiles the waste and transports it, the manifest is built from information that provider already verified, instead of being typed up from scratch at the dock.
What a Manifest Is For
The manifest is the paper trail behind RCRA’s cradle-to-grave system. It follows the waste from your dock to its final destination, every party that handles the shipment signs it, and a completed copy comes back to you as proof the waste arrived where you said it would.
It does three jobs at once:
- It is the RCRA tracking document, recording custody from generator to transporter to facility
- It is the DOT shipping paper for the load, carrying the hazmat description and emergency response information
- It is your proof of compliance, the record an inspector asks for first
It does not replace your own determination of what the waste is. The manifest only records what you have already worked out, which is why it is only as accurate as the hazardous waste determination and the waste profile behind it.
The Form, Field by Field
EPA Form 8700-22 has 20 numbered items. The generator completes Items 1 through 15. The transporters and the receiving facility complete the rest.
Generator section
| Item | What goes in it |
|---|---|
| 1 | Generator’s EPA ID number |
| 2 | Page 1 of the total pages, if continuation sheets are used |
| 3 | 24-hour emergency response phone number |
| 4 | Manifest tracking number, preprinted on the form |
| 5 | Generator’s name, mailing address, phone, and site address if different |
| 6 | Transporter 1 name and EPA ID number |
| 7 | Transporter 2 name and EPA ID number, if any |
| 8 | Designated facility name, site address, phone and EPA ID number |
| 9a | “X” if the waste is a DOT hazardous material |
| 9b | DOT description: UN or NA number, proper shipping name, hazard class and packing group |
| 10 | Number and type of containers |
| 11 | Total quantity |
| 12 | Unit of weight or volume |
| 13 | Waste codes: up to six federal and state codes per line |
| 14 | Special handling instructions and additional information |
| 15 | Generator’s or offeror’s certification: printed name, signature and date |
| 16 | International shipments, if the waste is being exported or imported |
Transporter and facility section
| Item | What goes in it |
|---|---|
| 17 | Each transporter’s acknowledgment of receipt: printed name, signature and date |
| 18 | Discrepancies found by the receiving facility, including rejected loads |
| 19 | Hazardous waste report management method codes, showing how each waste was managed |
| 20 | Designated facility’s certification of receipt: printed name, signature and date |
If a shipment has more waste lines than the form holds, the continuation sheet, EPA Form 8700-22A, carries the rest.
The manifest tracking number is a 12-character number: nine digits followed by three letters identifying the registered printer. You cannot make up your own forms. Paper manifests must come from an EPA-registered printer.
Container type codes in Item 10 follow EPA’s list. The common ones:
| Code | Container |
|---|---|
| DM | Metal drums, barrels or kegs |
| DF | Fiberboard or plastic drums, barrels or kegs |
| CF | Fiber or plastic boxes, cartons or cases |
| CM | Metal boxes, cartons or cases |
| CY | Cylinders |
| TP | Portable tanks |
| TT | Cargo tanks (tank trucks) |
Unit codes in Item 12 are G (gallons), L (liters), P (pounds), T (tons), K (kilograms), M (metric tons), Y (cubic yards) and N (cubic meters).
Waste codes in Item 13 are where most manifest errors start. A waste often carries more than one code, and every applicable code should be listed, which comes back to assigning the correct RCRA waste codes in the first place.
Who Signs the Manifest
Three signatures are required on every shipment, and each one transfers custody.
The generator signs Item 15 before the waste leaves. That should be someone with knowledge of the waste and the authority to certify it, usually an EHS manager, a facility manager or a trained designee. The signer is making two certifications:
- The DOT certification that the shipment is properly described, packaged, marked and labeled
- The waste minimization certification. Large quantity generators certify that they have a program in place to reduce the volume and toxicity of their waste. Small quantity generators certify a good-faith effort. Our guide to the hazardous waste reduction plan covers what that program actually has to be.
Each transporter signs Item 17 on acceptance and gives the generator a copy before leaving.
The designated facility signs Item 20 on arrival and notes any discrepancies in Item 18.
Anyone who prepares or signs a manifest needs DOT hazmat training, which runs on a three-year cycle rather than the annual RCRA cycle. Our guide to RCRA training requirements explains how the clocks differ.
Paper, Electronic and Hybrid Manifests
Since June 30, 2018, EPA has run the national e-Manifest system, and manifests can now be completed three ways:
- Electronic: every party signs in e-Manifest
- Paper: the five-copy paper form, with the designated facility submitting the final copy to EPA
- Hybrid: the generator signs on paper and the transporter and facility complete it electronically
The paper form went from six copies to five copies when e-Manifest launched:
| Copy | Who keeps it |
|---|---|
| 1 | Designated facility submits it to EPA’s e-Manifest system |
| 2 | Designated facility sends it to the generator |
| 3 | Designated facility keeps it |
| 4 | Transporter keeps it |
| 5 | Generator keeps it as the initial copy |
The receiving facility pays the e-Manifest user fee, not the generator. To sign electronically, the generator’s signer needs an account registered in EPA’s RCRAInfo system.
When the Signed Copy Has to Come Back
The receiving facility must send the generator a signed copy within 30 days of delivery.
If that copy doesn’t arrive, the generator has deadlines of its own:
- Large quantity generators: if no signed copy has arrived within 35 days of the transporter accepting the waste, contact the transporter and the facility. If it still hasn’t arrived by day 45, file an exception report with EPA or the state.
- Small quantity generators: if no signed copy has arrived within 60 days, send a copy of the manifest to EPA or the state, with a note that receipt was not confirmed.
A missing return copy is the earliest warning you get that your waste didn’t arrive where it was supposed to. Track it against the dates, not against memory.
How Long to Keep Hazardous Waste Manifests
Generators must keep each manifest for at least three years from the date the waste was accepted by the initial transporter. Keep the signed copy that comes back from the facility, along with any exception reports.
Transporters and receiving facilities each keep their copies for three years as well. All of these periods extend automatically while an enforcement action is unresolved, and some states require longer.
In practice, keep the generator’s initial copy until the signed copy arrives, then keep the signed copy and any exception reports for three years.
Discrepancies, Rejections and Corrections
Discrepancies. If what arrives doesn’t match the manifest, the receiving facility records it in Item 18. Significant discrepancies must be reconciled with the generator within 15 days, or reported to EPA or the state. A significant discrepancy is a weight difference of more than 10% on a bulk load, or any difference in the piece count on a non-bulk load, or a waste that is a different type from what was described.
Rejected loads. If the facility refuses some or all of a shipment, the rejected waste is sent back to the generator or on to an alternate facility on a new manifest or the original one, depending on where it is in the process. The generator is still responsible for it.
Corrections. Once a manifest has been signed, it shouldn’t be rewritten by hand. Corrections go through the designated facility and, for electronic and hybrid manifests, through e-Manifest. Get the form right before the truck leaves, because fixing it afterward involves everyone in the chain.
Who Needs a Manifest, and Who Doesn’t
Small and large quantity generators need a manifest for every off-site hazardous waste shipment.
Very small quantity generators are generally exempt from the federal manifest requirement. However, many states require one, and most receiving facilities expect one regardless. Check your generator category first, because it decides which manifest and return-copy rules apply to you.
Universal waste and used oil move without a hazardous waste manifest under their own rules, usually on a bill of lading or shipping record.
Non-hazardous waste manifests aren’t a federal requirement. Many waste vendors and some states still use a non-hazardous manifest or bill of lading as the shipping and tracking record for industrial waste that doesn’t meet the RCRA definition. It is good practice, and it is the document that proves a non-hazardous determination was made if anyone asks later.
Regulated medical waste is tracked under state rules rather than the RCRA manifest, usually on a state medical waste tracking form or shipping document.
A Pre-Pickup Manifest Checklist
Before you sign:
- Your EPA ID number and the site address match your notification
- The transporter and designated facility EPA ID numbers are correct
- Every waste line has the right DOT description, waste codes, container count, type code and quantity
- The emergency response number is staffed 24 hours
- Land disposal restriction paperwork is attached for first shipments of each waste stream
- The person signing has current DOT hazmat training
- Your copy is filed, and the date for the return copy is on the calendar
That last item ties into your pickup schedule. Shipments are timed around your accumulation time limits, and the return-copy clock starts the day the truck leaves.
Frequently Asked Questions
What information must be included on a hazardous waste manifest? The generator’s name, address and EPA ID number; each transporter’s name and EPA ID; the designated facility’s name, address and EPA ID; the DOT shipping description, waste codes, container count and type, and total quantity; an emergency response phone number; and the signatures of the generator, each transporter and the receiving facility.
What is a hazardous waste manifest? The Uniform Hazardous Waste Manifest, EPA Form 8700-22, is the shipping and tracking document required for off-site shipments of hazardous waste. It follows the waste from the generator to its final destination and is signed at each transfer of custody.
Who must sign a hazardous waste manifest? The generator, each transporter, and the designated receiving facility. The generator’s signer must be trained and authorized to certify that the waste is correctly described and packaged.
How long must hazardous waste manifests be kept? At least three years from the date the waste was accepted by the initial transporter. The period extends during enforcement actions, and some states require longer.
How long does the disposal facility have to return the signed manifest? The receiving facility must send the generator a signed copy within 30 days of delivery. Large quantity generators must follow up at 35 days and file an exception report at 45 days. Small quantity generators must notify EPA or the state at 60 days.
What is the 5-part uniform hazardous waste manifest? The current paper version of EPA Form 8700-22. It has five copies: one submitted to EPA’s e-Manifest system, one returned to the generator, one kept by the facility, one by the transporter and one by the generator.
Can a hazardous waste manifest be electronic? Yes. Since 2018, manifests can be fully electronic in EPA’s e-Manifest system, paper, or hybrid, with the generator signing on paper and the rest completed electronically.
Do very small quantity generators need a manifest? Not under federal rules in most cases, but many states require one and most receiving facilities expect one. Check your state’s rules.
Is a manifest required for non-hazardous waste? Not federally. Many vendors and some states use a non-hazardous manifest or bill of lading anyway, and it is good practice for documenting the shipment.
One Team, One Paper Trail
Most manifest problems are information problems: a waste code that didn’t make it from the profile to the form, a container count that changed at the dock, a facility ID copied wrong. The fewer hands the information passes through, the fewer places it can go wrong.
TriHaz Solutions profiles, packages, transports and disposes of hazardous waste for healthcare facilities, laboratories and industrial generators across Alabama, Tennessee, Georgia, Mississippi, North Carolina and Florida. Our own trucks carry the waste under our own EPA transporter ID, and the manifest is prepared from the same records. Our guide to hazardous waste transporter requirements covers what to check before anyone hauls your waste. For lab chemicals and small-container inventories, lab pack disposal covers the packing, manifesting and disposal as a single job.
How to Tie a Red Bag: Watch the Video
How NOT to Tie a Red Bag: Watch the Video
SUBSCRIBE TO OUR BLOG
Simplify your job and stay up-to-date on medical and hazardous waste compliance for healthcare and industry.
By subscribing to our blog you agree to ourĀ Privacy Policy.